2018-March-19 – Tom Barbalet

Home / Operations / 2018-March-19 – Tom Barbalet

It was based on my new operating regime however I squeezed in another Operator and this caused me to work overtime operating the master control panels. 

Thanks to TomGloria-Don MoysesBarryRosslyn, Wayne, Peter J, Peter S, JohnBrentonDes and Derek M for a great day,  There were a total of 50 Train movements handled by 6 Operator groups.

Operator 1 Instructions

Operator 1

 

Operator 2 Instructions

Operator 2

 

Operator 3 Instructions

Operator 3

 

Operator 4 Instructions

Operator 4

 

Operator 5 Instructions

Operator 5

 

Operator 6 Instructions

Operator 6